
In February 2025, Neswalk Technology Co., Ltd. officially launched the procurement phase for the Djibouti Hospital EPC project, covering 12 major categories of materials, including:
-Medical airtight doors
-Hospital ward elevators
-Knauf antibacterial ceiling systems
-Opple Clean lighting solutions
-Generator sets
-Legrand switches
-Decorative curtain walls
-Thermal insulation Aluminum doors & windows
Over a 20-day period, Neswalk conducted factory inspections alongside engineering and government representatives from the Djibouti Hospital project. The first round of core supplier selection has been completed, with eight key suppliers finalized, including:
Knauf’s premium ceiling systems, demonstrating excellent antibacterial properties tailored for hospital sterile zones.
Opple Lighting, providing customized LED solutions for operating rooms and public areas.
Asia-Pacific ThyssenKrupp Elevator (TNE), delivering safe and smooth bed elevators equipped with emergency power-leveling functions.
Medical Doors, meeting radiation protection, durability, and cleanliness requirements.
Additionally, the project team has finalized technical specifications for:
Antibacterial & fire-resistant wooden doors
Energy-optimized aluminum doors/windows
Smart-integrated fire protection systems
The design rigorously accounts for Djibouti’s tropical desert climate, including extreme summer temperatures exceeding 45°C (113°F).